Railway infrastructure works - Uccle
Description
The project consisted of infrastructure work along the track bed platform where railway lines L124 and L26 intersect. Several bridge decks were renovated and noise barriers installed, including 2,000 m² of green walls. For the Moensberg station at Uccle, new platforms have been built. Simultaneous with these main works diverse road, bedding, demolition, earth- and sewerage works were performed.
Some figures:
- Earthworks: 50,500 m³.
- Steel delivered: 680 tonnes.
- Concrete TPG: 8,800 m³.
location
Project Details
Contractor
Horzelstraat 300, Ukkel, Brussels, Belgium
Client
Infrabel
Engineering Office
TUC Rail
Construction period
3 years 5 months
Start work
01-2011
End of work
06-2014