Pont de Luttre - Luttre

Description 

Replacement of the 'Pont de Luttre' over the canal Charleroi-Brussels.

Our assignment included:

  • Various preparatory works;
  • The local relocation of towpaths on both banks of the canal (for the construction of the new intermediate piers);
  • The construction of two new abutments and two new intermediate piers;
  • The construction of a new bridge deck;
  • The construction of new roads connecting to the new bridge, including the construction of new connections to the various public and private entrances;
  • The demolition of the existing bridge and the roads connecting to the existing bridge;
  • The construction of new accesses to the towpath on the banks of Pont-à-Celles (pedestrian stairs + cycle path);
  • The development of the surrounding area and equipment of the structures.

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.

 
location 

Project Details

Contractor
Luttre, Hainaut, Belgium
Client 
SPW Direction des voies hydrauliques de Namur et Charleroi
Price 
€2.500.000
Span 
84m
Construction period
2 years 5 months
Start work
01-2016
End of work
06-2018