Johnny Ronaldobrug - Muizen

Description 

Demolition of the existing bridge and modification of the abutments, overhead lines, roadway and drainage. Above the railway, we will build a new steel bowstring bridge together with Almex. In September 2020, preparations started for the overhead line works. In early October, the temporary pedestrian bridge was installed to maintain a connection between the centre of Muizen and the school across the station. Demolition of the old bridge was scheduled for the weekend of 11 October. On the weekend of 13 and 14 February 2021, the new bridge was installed.

Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.

 
location 

Project Details

Contractor
Stationsberg, Muizen, Antwerpen, Belgium
Client 
Infrabel
Special features
Construction period
10 months
Start work
08-2020
End of work
06-2021