PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Johnny Ronaldobrug - Muizen
 

Project Details


Activities
Civil Engineering
Bridges

Contractors
Franki Construct

location
Stationsberg
2812 Muizen
Belgium
Antwerpen BE

Client
Infrabel

Special features

Construction period 
10 months

Start work 
08-2020

End of work 
06-2021


 

Demolition of the existing bridge and modification of the abutments, overhead lines, roadway and drainage. Above the railway, we will build a new steel bowstring bridge together with Almex. In September 2020, preparations started for the overhead line works. In early October, the temporary pedestrian bridge was installed to maintain a connection between the centre of Muizen and the school across the station. Demolition of the old bridge was scheduled for the weekend of 11 October. On the weekend of 13 and 14 February 2021, the new bridge was installed.

Franki Construct

Kartuizersweg 1
2550 Kontich (Belgium)
tel +32 3 821 16 80
FCVINFO@franki.be
www.franki.be

Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.