Tunnel under Gent-Dampoort railway line - Ghent
Description
The construction project involves the construction of a new cycle and pedestrian tunnel under the railway line, a new coach park and work in the surrounding areas at the Gent-Dampoort station. A new tunnel is being built under the track to create a safer cycling connection. The cycle paths are largely being installed using a concrete U-passage. The new tunnel under the track is realised using the box jacking method, with the tunnel going through the railway embankment. The jacked tunnel is 23m long.
Â
News
26/04/2019 - 15:30
05/03/2018 - 14:30
location
Project Details
Contractor
Station Gent-Dampoort, Gent, Oost-Vlaanderen, Belgium
Client
Stad Gent
Engineering Office
Sweco
Span
23m
Surface area subterranean
1 200m²
Construction period
1 year 1 month
Start work
03-2018
End of work
04-2019