Pedestrian bridge - Thuin

Description 

Construction of a pedestrian bridge in Thuin (between Rue t'Serstevens on the right bank and Chemin du Halage on the left bank).

  • bridge deck: "curved" metal structure: 40m span - maximum width = 6m
  • installation of the footbridge by launch
  • deck of the footbridge in azobe wood
  • galvanised steel handrail

 

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.

News

 
location 

Project Details

Contractor
chemin du Halage, Thuin, Hainaut, Belgium
Client 
SPW - Direction des Voies hydrauliques de Charleroi
Architects 
SPW
Engineering Office 
BE Greisch
Span 
40m
Construction period
1 year 3 months
Start work
10-2018
End of work
01-2020