Labo building BASF - Antwerp
Description
Franki Construct has built a new laboratory in the port of Antwerp on the BASF site, which is the largest chemical production centre in Belgium.
The building measures 61 m x 35 m and is 16 m high. The ground floor and first floor are made from concrete. Columns, beams, arches and concrete façade panels are used on the ground floor. The “technical floor” is a steel construction, and the first and second floors have metal cladding. The laboratory is equipped with a green roof.
location
Project Details
Contractor
Scheldelaan 600, Antwerpen, Antwerpen, Belgium
Client
BASF Antwerpen
Special features
Construction period
1 year 5 months
Start work
01-2019
End of work
06-2020