Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.
![](https://willemen.be/sites/default/files/styles/prev_next_nav_80x60/public/15_01_10-Les_Rouges_Terres-Brochure-R9%20-%20derni%C3%A8re%20version.jpg?itok=UPXymB9t)
Residence Les Rouges Terres -...
Residence Les Rouges Terres is right in the...
![](https://willemen.be/sites/default/files/styles/prev_next_nav_80x60/public/Marconi%20Luchtfoto%203_0.jpg?itok=MkBHrBqn)
Tram depot Marconi - Brussels
The Marconi tram depot has 22 tracks and...
GO! campus Ruggeveld - Deurne
Description
Franki Construct is converting an existing school building into a pupil guidance centre (Centrum voor Leerlingenbegeleiding - CLB), an adult education centre (Centrum voor Volwassenenonderwijs - CVO) and an open learning centre (Open Leercentrum - OLC).
The project comprises the following works:
- Demolition of existing surroundings
- Complete stripping of the interior of the existing building: 6 storeys with a floor space of 7,500m². The façades and exterior joinery are retained.
- All-new interior trim
- The new development portion to the façade has a crawl space and a ground floor with a surface area of 500m². This new development consists of a foundation on steel, prefab columns, hollow-core slabs and a canopy consisting of a streel structure.
- Technical installations: sanitary facilities, HVAC, electricity and 1 lift
- Surrounding area of 11,000m²
Â
Â
News
22/10/2016 - 14:00
location
Project Details
Contractor
Ruggeveldlaan 471, Deurne, Antwerpen, Belgium
Client
GO! onderwijs van de Vlaamse Gemeenschap
Architects
Grosfeld van der Velde
Boonen Michielsens
Engineering Office
Studie 10
Construction period
1 year 1 month
Start work
09-2015
End of work
10-2016