PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Prison - Leuze-en-Hainaut
 

Project Details


Activities
Buildings
Public
Integral projects
Bouwteam
Design & Build

Contractors
Willemen Construct

location
Avenue de l'Europe
7900 Leuze-en-Hainaut
Belgium
Hainaut BE

Client
Regie der Gebouwen

Price
€75.000.000

Architects
Assar Architects
Storimans Wijffels
DDS & Partners

Temporary partnership
Willemen General Contractor, Cordeel

Engineering Office
Pirnay (stabiliteit), Arch & Teco (technieken), Venac (akoestiek)

Special features

Construction period 
1 year 8 months

Start work 
09-2012

End of work 
05-2014


 

This prison for 364 prisoners was built as a PPP project in DBFM on a site of 14.47 hectares. The starting point of our design strategy was to improve the quality of life of the prisoners and to reduce their detachment from the outside world. This is translated in various ways in the project: prison in the cloud, the wide corridors in the cell wings, the integration of art into the panoptic centre, etc. More than 1,000 m² of integrated reed beds provide wastewater treatment. The building has a ‘Very Good’ BREEAM rating.

 

Willemen Construct

Boerenkrijgstraat 133
2800 Mechelen (Belgium)
tel +32 15 56 99 65
willemen@willemen.be
www.willemen.be

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.