PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Animal hospital of Sart-Tilman - Liège
 

Project Details


Activities
Buildings
Offices
Education
Care

Contractors
Franki

location
Avenue de Cureghem, 1
4000 Liege
Belgium
Liege BE

Client
Université de Liège (ULG)

Price
€10.000.000

Architects
Syntaxe
Artau

Temporary partnership
Franki, Moury

Engineering Office
BE Lemaire

Surface area above ground
3 000m²

Special features

Construction period 
2 years 5 months

Start work 
11-2016

End of work 
04-2019


 

Construction of an animal hospital for ULiège, boarding school for students and environmental landscaping.

  • 12 rooms / 4 operating rooms / 900 m2 operating theatre
  • Glass walls and doors to neutralise X-rays
  • ISO 05 and 07 standards (laminar flow)
  • Construction of pressure areas
  • 1700 m2 copper cladding
  • Passive 1st floor (insulation: facade, 40 cm thick glass wool and roof, 40 cm thick PIR panels)
Franki

Chemin des moissons, 10
4400 Flémalle, Liege (Belgium)
tel +32 4 2505150 | +32 4 3493939
info@franki.be
www.franki.be

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.