Surface area above ground
27 000m²

Special features

Construction period 
9 months

Start work 
12-2018

End of work 
09-2019


 

Realisation of the closed shell of the new campus for US data centre operator CyrusOne with a capacity of 72 megawatts. The structure consists of 3,500 tonnes of steel and 4,000 m³ of concrete and is founded on 3,500 foundation piles.

 

Willemen Bouw

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 3 450 77 00
bouw@willemen.be
www.willemen.be

Willemen Bouw was established on 30 April 2025 through the merger of Willemen Construct, Cosimco, Franki Construct and Tools.