PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Waste incineration plant Indaver-Suez - Doel
 

Project Details


Activities
Civil Engineering
Heavy industry

Contractors
Franki Construct

location
Haven 1940, Molenweg
9130 Doel
Belgium
Oost-Vlaanderen BE

Client
Lurgi

Engineering Office
Arcade


 

The project concerns the construction of the new waste incinerator that recuperates energy from the incineration of waste.
The complex consists of an unloading hall, a concrete waste bunker, a furnace building, a turbine building, various concrete ash bunkers and a building for the scrubber.
The concrete bunkers are 40 m high and were constructed using a slipform.
Various 40 m high steel structures were also installed to accommodate the different parts of the production process.
The capacity of the fluidised bed furnace is 430 000 tonnes/year. This makes it one of the largest on the European continent.

Franki Construct

Kartuizersweg 1
2550 Kontich (Belgium)
tel +32 3 821 16 80
FCVINFO@franki.be
www.franki.be

Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.