Executed works
Construction of 52 assisted living residences, 4 residential pavilions and a service centre
 
Location 
Bleukstraat 11, Bonheiden, Antwerpen, Belgium
 
Client
Ter Bleuk nv
 
Price
€7.675.000
 
Architects
Kennes Elegeert De Ruysscher
 
Construction period 
2 years 1 month
 
Start work 
01-2014
 
End of work 
02-2016
 

In January 2014, Willemen started building 52 assisted living units in four housing blocks to replace the current Ter Bleuk senior citizens home in Bonheiden.

The housing blocks are each two storeys high with complete basements, and are interconnected by an underground passageway connected to a central service building. Each housing block has six to eight assisted living units per floor and a meeting room on each corridor. All areas are wheelchair and lift-accessible. The central multipurpose block will feature a brasserie, meeting room, physiotherapy room and gym, a spa, a laundry room and a consultation room. This building will also be fitted with a green roof.

The building work is being undertaken in two phases. Phase one consists of the central block and three residential blocks into which the nursing home residents will move. Phase two involves the demolition of the existing building and the construction of the fourth housing block.

Willemen Construct

Boerenkrijgstraat 133
2800 Mechelen (Belgium)
tel +32 15 56 99 65
willemen@willemen.be
www.willemen.be

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.
     © Willemen Groep