PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Drie Fonteinenbrug - Drogenbos
 

Project Details


Activities
Civil Engineering
Bridges

Contractors
Franki Construct

location
Drie Fonteinenstraat
1620 Drogenbos
Belgium
Vlaams Brabant BE

Client
De Vlaamse Waterweg

Temporary partnership
Franki Construct, Hye

Construction period 
3 years 1 month

Start work 
06-2019

End of work 
07-2022


 

This 600 tonne steel arch bridge is 74 metres long and over 17 metres wide, and is expected to improve access and road safety in and around the business park adjacent to the Brussels-Charleroi Canal. The bridge was built in the workshop in twelve transportable sections. The individual sections were then assembled on site along the canal and finally transported by ship to their final position with the necessary care and precision before being placed.
 

Franki Construct

Kartuizersweg 1
2550 Kontich (Belgium)
tel +32 3 821 16 80
FCVINFO@franki.be
www.franki.be

Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.