CHU Mont Godinne - Yvoir
 

Project Details


Activities
Buildings
Care

Contractors
Franki

location
Avenue du Docteur Gaston Thérasse , 1
5530 Yvoir
Belgium
Namur BE

Client
CHU - UCL Mont-Godinne - Dinant

Price
€5.200.000

Architects
DDV

Temporary partnership
Franki, Jan De Nul

Engineering Office
Bureau d'études Lemaire, T.E.E., Arch & Teco Engineering

Construction period 
2 years 2 months

Start work 
12-2015

End of work 
02-2018


 

Partial renovation of 2 wings of the existing hospital.

CHU Dinant Godinne renovated its three intensive care units on the Godinne site. To alleviate a situation of chronic bed overcrowding and in view of the increase in the number of patients undergoing major operations (including lung transplants), the renovation of the unit was an opportunity to set up a new intensive care unit. This renovation of the ward was thus the occasion to create a new structure: unit C. In reality, this unit existed before it was replaced by unit D, which opened in 2005. Having served as a buffer during the renovation of Units A and B, Unit C was in turn renovated to accommodate additional beds. Initially, the six beds in unit C will be open only on weekdays. If the need arises in the future, a 7-day opening may be considered.
The intensive care unit at the Godinne site now has 30 beds suitable for adult medical and post-operative patients who have undergone high-risk surgery or have significant co-morbidities.

Franki

Chemin des moissons, 10
4400 Flémalle, Liege (Belgium)
tel +32 4 2505150 | +32 4 3493939
info@franki.be
www.franki.be

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.