PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Bow-string bridge - Sambreville
 

Project Details


Activities
Civil Engineering
Bridges
Railway infrastructure & stations

Contractors
Franki

location
Rue de l'Abattoir
5060 Sambreville
Belgium
Namur BE

Client
Infrabel

Price
€1.200.000

Span
52m

Construction period 
2 years 8 months

Start work 
10-2016

End of work 
06-2019


 

Replacement of the metal structure of the bridge over the Samber, situated at BK 1.037. This bridge is one of the last bridges in fish belly shape.

Franki

Chemin des moissons, 10
4400 Flémalle, Liege (Belgium)
tel +32 4 2505150 | +32 4 3493939
info@franki.be
www.franki.be

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.