Bergwijkbrug - Merelbeke
 

Project Details


Activities
Civil Engineering
Bridges

Contractors
Franki Construct

location
Fraterstraat
9820 Merelbeke
Belgium
Oost-Vlaanderen BE

Client
De Vlaamse Waterweg, AWV Oost-Vlaanderen, Gemeente Merelbeke

Temporary partnership
Herbosch-Kiere

Construction period 
1 year 4 months

Start work 
08-2020

End of work 
12-2021


 

The new Bergwijk Bridge in Merelbeke, almost 100 metres long, was opened at the end of 2021. It meets all modern needs, ensures safer and smoother traffic and, thanks to its higher headroom, also guarantees smooth sea traffic on the Ringvaart.

We started work on this new three-lane bridge and a cantilevered composite cycle track in the summer of 2020. In order to limit nuisance, the new bridge was built next to the old one. After the demolition of the 60-year-old bridge in January, the new bridge could be moved to its final position during the building holidays in July.

The banks of the Ringvaart were completely renovated at the same time. Both interventions make the Ringvaart accessible to modern ships carrying three layers of containers. These additional advantages make the waterway an even more attractive alternative to road transport. The bridge is also an important link in the F40 cycle highway, the major cycle route around Ghent. The heavy traffic and the limited space available made this construction project particularly complex.
 

Franki Construct

Kartuizersweg 1
2550 Kontich (Belgium)
tel +32 3 821 16 80
FCVINFO@franki.be
www.franki.be

Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.