PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Central Radiochemical Facility - Mol
 

Project Details


Activities
Civil Engineering
Heavy industry

Contractors
Willemen Construct

location
Boerentang 200
2400 Mol
Belgium
Antwerpen BE

Client
SCK CEN Stichting Openbaar Nut

Architects
Arteum Architects

Engineering Office
Sweco Belgium (stabiliteit)

Construction period 
10 months

Start work 
03-2023

End of work 
01-2024


 

At the SCK site in Mol, Franki Construct is building a new production facility for medical radioisotopes. The CRF building will consist of two zones:

  • A controlled zone with a number of clean rooms for isotope production, areas for packaging the products and waste management, and radiological laboratory areas for checks and preparations.
  • A zone with office spaces, a meeting room, a chemical laboratory space for preparations and sanitary facilities.
Willemen Construct

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 15 56 99 65
bouw@willemen.be
www.willemen.be

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.