PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Ecoduct Dilserbos - Dilsen-Stokkem
 

Project Details


Activities
Civil Engineering
Bridges

Contractors
Willemen Construct

location
Boslaan
3650 Dilsen-Stokkem
Belgium
Limburg BE

Client
Agentschap Wegen en Verkeer Limburg

Architects
BUUR

Span
34m

Project website


 

Commissioned by the Agency for Roads and Traffic (AWV), Franki Construct will build a cycle bridge and an ecoduct over the Boslaan (N75), near the Sparrendal recreation area in Lanklaar. This should allow cyclists, pedestrians and animals to move safely between the nature areas of the Hoge Kempen National Park that the Boslaan currently cuts through. The project is done in cooperation with the Agency for Nature and Forests, the Department of Environment, the Department of Mobility and Public Works, the Regional Landscape Kempen & Maasland, the city of Dilsen-Stokkem & VAPEO (Vlaams Actieprogramma Ecologische Ontsnippering).

Willemen Construct

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 15 56 99 65
bouw@willemen.be
www.willemen.be

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.